Lemma D2.h1 (medium).
07 cmb operational closure planck pipeline
Hook. Prove that the stable neutral admissible sector is complete.\\ Proposed solution. Spectral completeness of [formula in source] follows from Paper 2's carrier classification combined with Paper 4's admissibility constraints. Strategy: enumerate every stable neutral spin-0/1/2 mode, verify [formula in source] , verify the [formula in source] leakage from [formula in source] . Acceptance: a Paper-2 corollary stati
Opening source excerpt. Formulas and the full argument remain in the original document.
Source location and explicit evidence links
documents/archive--tfpt-45--07_cmb_operational_closure_planck_pipeline/sections/007-section-hook-solution-sketches-v4-6-5.tex · lines 129 to 140
These are recorded citation relations. A source citation or topic match does not establish a mathematical or physical result.
No explicit verification citation is attached to this section in the registry.