Critical-path roadmap (7 steps)
07 cmb operational closure planck pipeline
The seven steps are sequenced in tfpt_cmb.proof_discharge_v466.ROADMAP_V466. When all seven complete, every status flag in the pipeline flips from derived_tfpt_candidate_v46 to derived_tfpt without further code changes.
Opening source excerpt. Formulas and the full argument remain in the original document.
Source location and explicit evidence links
documents/archive--tfpt-45--07_cmb_operational_closure_planck_pipeline/sections/004-subsection-what-a-passing-sprint-2a-run-looks-like.tex · lines 101 to 133
These are recorded citation relations. A source citation or topic match does not establish a mathematical or physical result.
No explicit verification citation is attached to this section in the registry.