The v4.12 final-gate matrix
07 cmb operational closure planck pipeline
Combining the v4.11 BT2 / Ward / Provenance results with the v4.12 QCD discharge gives twelve final-gate checks that all pass:
Opening source excerpt. Formulas and the full argument remain in the original document.
Source location and explicit evidence links
documents/archive--tfpt-45--07_cmb_operational_closure_planck_pipeline/sections/006-subsection-the-bt2-operator-discharge-v4-11.tex · lines 115 to 134
These are recorded citation relations. A source citation or topic match does not establish a mathematical or physical result.
No explicit verification citation is attached to this section in the registry.